EPC Rating D — 15, Cove Meadow, Wilcove, Torpoint, PL11 2RD

Score: 59/100 154.40 m² Lodged 27 May 2010

← View full property profile

Potential rating EPC D (65/100)
Property type Bungalow
Main heating Boiler and radiators, oil
CO₂ emissions 8.00 tonnes/year

Frequently Asked Questions

What is the EPC rating of 15, Cove Meadow, Wilcove, Torpoint, PL11 2RD?

15, Cove Meadow, Wilcove, Torpoint, PL11 2RD has an EPC rating of D with a score of 59/100.

Can the EPC rating of 15, Cove Meadow, Wilcove, Torpoint, PL11 2RD be improved?

Yes — the potential rating is D (65/100).

What are the estimated heating costs?

Current estimated heating costs are £877/year, potentially reducible to £771/year with improvements.