EPC Rating C — 18, Post Meadow, Iver, SL0 0DU

Score: 74/100 169.00 m² Lodged 1 Mar 2016

← View full property profile

Potential rating EPC B (85/100)
Property type House
Main heating Boiler and radiators, mains gas
CO₂ emissions 4.20 tonnes/year

Frequently Asked Questions

What is the EPC rating of 18, Post Meadow, Iver, SL0 0DU?

18, Post Meadow, Iver, SL0 0DU has an EPC rating of C with a score of 74/100.

Can the EPC rating of 18, Post Meadow, Iver, SL0 0DU be improved?

Yes — the potential rating is B (85/100).

What are the estimated heating costs?

Current estimated heating costs are £667/year, potentially reducible to £639/year with improvements.