EPC Rating E — 27, The Row, Sutton, Ely, CB6 2PD

Score: 42/100 137.00 m² Lodged 12 Jan 2016

← View full property profile

Potential rating EPC B (82/100)
Property type House
Main heating Boiler and radiators, mains gas
CO₂ emissions 9.70 tonnes/year

Frequently Asked Questions

What is the EPC rating of 27, The Row, Sutton, Ely, CB6 2PD?

27, The Row, Sutton, Ely, CB6 2PD has an EPC rating of E with a score of 42/100.

Can the EPC rating of 27, The Row, Sutton, Ely, CB6 2PD be improved?

Yes — the potential rating is B (82/100).

What are the estimated heating costs?

Current estimated heating costs are £1,659/year, potentially reducible to £720/year with improvements.