EPC Rating D — 31, Orchard Way, Mosterton, Beaminster, DT8 3LT

Score: 58/100 121.00 m² Lodged 16 Sep 2019

← View full property profile

Potential rating EPC C (76/100)
Property type House
Main heating Boiler and radiators, oil
CO₂ emissions 5.90 tonnes/year

Frequently Asked Questions

What is the EPC rating of 31, Orchard Way, Mosterton, Beaminster, DT8 3LT?

31, Orchard Way, Mosterton, Beaminster, DT8 3LT has an EPC rating of D with a score of 58/100.

Can the EPC rating of 31, Orchard Way, Mosterton, Beaminster, DT8 3LT be improved?

Yes — the potential rating is C (76/100).

What are the estimated heating costs?

Current estimated heating costs are £741/year, potentially reducible to £583/year with improvements.