EPC Rating E — 31, Tennyson Drive, Warrington, WA2 9BZ

Score: 45/100 77.00 m² Lodged 24 Sep 2013

← View full property profile

Potential rating EPC C (73/100)
Property type House
Main heating Boiler and radiators, mains gas
CO₂ emissions 5.60 tonnes/year

Frequently Asked Questions

What is the EPC rating of 31, Tennyson Drive, Warrington, WA2 9BZ?

31, Tennyson Drive, Warrington, WA2 9BZ has an EPC rating of E with a score of 45/100.

Can the EPC rating of 31, Tennyson Drive, Warrington, WA2 9BZ be improved?

Yes — the potential rating is C (73/100).

What are the estimated heating costs?

Current estimated heating costs are £996/year, potentially reducible to £684/year with improvements.