EPC Rating E — 41, Castle Terrace, Berwick-Upon-Tweed, TD15 1NZ

Score: 52/100 148.00 m² Lodged 27 Mar 2013

← View full property profile

Potential rating EPC C (75/100)
Property type House
Main heating Boiler and radiators, mains gas
CO₂ emissions 8.60 tonnes/year

Frequently Asked Questions

What is the EPC rating of 41, Castle Terrace, Berwick-Upon-Tweed, TD15 1NZ?

41, Castle Terrace, Berwick-Upon-Tweed, TD15 1NZ has an EPC rating of E with a score of 52/100.

Can the EPC rating of 41, Castle Terrace, Berwick-Upon-Tweed, TD15 1NZ be improved?

Yes — the potential rating is C (75/100).

What are the estimated heating costs?

Current estimated heating costs are £1,392/year, potentially reducible to £956/year with improvements.