EPC Rating C — 73, Limpton Gate, Yarm, TS15 9JA

Score: 76/100 137.53 m² Lodged 6 Apr 2011

← View full property profile

Potential rating EPC C (78/100)
Property type House
Main heating Boiler and radiators, mains gas
CO₂ emissions 3.80 tonnes/year

Frequently Asked Questions

What is the EPC rating of 73, Limpton Gate, Yarm, TS15 9JA?

73, Limpton Gate, Yarm, TS15 9JA has an EPC rating of C with a score of 76/100.

Can the EPC rating of 73, Limpton Gate, Yarm, TS15 9JA be improved?

Yes — the potential rating is C (78/100).

What are the estimated heating costs?

Current estimated heating costs are £624/year, potentially reducible to £572/year with improvements.