EPC Rating D — 74A, Front Street East, Bedlington, NE22 5AB

Score: 60/100 73.00 m² Lodged 15 Jul 2016

← View full property profile

Potential rating EPC C (71/100)
Property type Flat
Main heating Boiler and radiators, mains gas
CO₂ emissions 4.20 tonnes/year

Frequently Asked Questions

What is the EPC rating of 74A, Front Street East, Bedlington, NE22 5AB?

74A, Front Street East, Bedlington, NE22 5AB has an EPC rating of D with a score of 60/100.

Can the EPC rating of 74A, Front Street East, Bedlington, NE22 5AB be improved?

Yes — the potential rating is C (71/100).

What are the estimated heating costs?

Current estimated heating costs are £797/year, potentially reducible to £512/year with improvements.