EPC Rating C — 8A, Amberley Slope, Werrington, Peterborough, PE4 6QG

Score: 80/100 165.65 m² Lodged 2 Sep 2009

← View full property profile

Potential rating EPC B (81/100)
Property type House
Main heating Boiler and underfloor heating, mains gas
CO₂ emissions 3.50 tonnes/year

Frequently Asked Questions

What is the EPC rating of 8A, Amberley Slope, Werrington, Peterborough, PE4 6QG?

8A, Amberley Slope, Werrington, Peterborough, PE4 6QG has an EPC rating of C with a score of 80/100.

Can the EPC rating of 8A, Amberley Slope, Werrington, Peterborough, PE4 6QG be improved?

Yes — the potential rating is B (81/100).

What are the estimated heating costs?

Current estimated heating costs are £436/year, potentially reducible to £443/year with improvements.