EPC Rating B — 90, Mill Race House, Thomas Way, Braintree, CM7 3AH

Score: 85/100 62.00 m² Lodged 2 Nov 2012

← View full property profile

Potential rating EPC B (85/100)
Property type Flat
Main heating Boiler and radiators, mains gas
CO₂ emissions 0.90 tonnes/year

Frequently Asked Questions

What is the EPC rating of 90, Mill Race House, Thomas Way, Braintree, CM7 3AH?

90, Mill Race House, Thomas Way, Braintree, CM7 3AH has an EPC rating of B with a score of 85/100.

Can the EPC rating of 90, Mill Race House, Thomas Way, Braintree, CM7 3AH be improved?

Yes — the potential rating is B (85/100).

What are the estimated heating costs?

Current estimated heating costs are £203/year, potentially reducible to £203/year with improvements.