EPC Rating C — First Floor Flat, 8, Redland Park, Bristol, BS6 6SB

Score: 69/100 77.00 m² Lodged 15 Apr 2025

← View full property profile

Potential rating EPC C (80/100)
Property type Flat
Main heating Boiler and radiators, mains gas
CO₂ emissions 2.90 tonnes/year

Frequently Asked Questions

What is the EPC rating of First Floor Flat, 8, Redland Park, Bristol, BS6 6SB?

First Floor Flat, 8, Redland Park, Bristol, BS6 6SB has an EPC rating of C with a score of 69/100.

Can the EPC rating of First Floor Flat, 8, Redland Park, Bristol, BS6 6SB be improved?

Yes — the potential rating is C (80/100).

What are the estimated heating costs?

Current estimated heating costs are £701/year, potentially reducible to £339/year with improvements.