EPC Rating C — Woodside, Kirk Street, Stillington, Stockton-On-Tees, TS21 1JR

Score: 72/100 86.00 m² Lodged 4 Jul 2017

← View full property profile

Potential rating EPC B (86/100)
Property type Bungalow
Main heating Boiler and radiators, mains gas
CO₂ emissions 3.10 tonnes/year

Frequently Asked Questions

What is the EPC rating of Woodside, Kirk Street, Stillington, Stockton-On-Tees, TS21 1JR?

Woodside, Kirk Street, Stillington, Stockton-On-Tees, TS21 1JR has an EPC rating of C with a score of 72/100.

Can the EPC rating of Woodside, Kirk Street, Stillington, Stockton-On-Tees, TS21 1JR be improved?

Yes — the potential rating is B (86/100).

What are the estimated heating costs?

Current estimated heating costs are £529/year, potentially reducible to £495/year with improvements.